Version 4 Revision to the FY 2019 CoC Application Detailed Instructions

Home Programs Resources Training
Version 4 Revision to the FY 2019 CoC Application Detailed Instructions, Required Attachments for 1E–Local CoC Competition Section
HUD revised and is releasing Version 4 of the FY 2019 CoC Application Detailed Instructions based on questions submitted regarding documented evidence submission requirements.
HUD will evaluate responses to questions 1E-2 (Project Review and Ranking—Objective Criteria), 1E-3 (Project Review and Ranking—Severity of Needs and Vulnerabilities), and 1E-4 (Public Postings—CoC Consolidated Application) of the CoC Application based on evidence posted to the 4B. Attachment screen, especially the attachment for question 1E-4.
Section VII.B.1. of the FY 2019 CoC Program Competition Notice of Funding Availability (NOFA) assigns the following points for 1E–Local CoC Competition questions:
  • 18 points for Objective Criteria and Past Performance
     
  • 4 points for Severity of Needs
     
  • 3 points for Ranking Process
     
  • 4 points for Reallocation (which is not being addressed in this listserv)
Question 1E-1 requires applicants to submit the following four attachments on the 4B. Attachments screen:
  • 1E-1. Public Posting–Local Competition Announcement that provided point values (e.g., the scoring tool indicating how points are awarded) or other ranking criteria the CoC would use to review and rank projects. HUD is clarifying that this evidence is not the same as the evidence required in question 1E-4. This evidence demonstrates the CoC informed applicants in advance how the CoC would evaluate project applications, whereas question 1E-4 requires applicants to provide actual final scores that the CoC publicly posted. Example attachments include:
     
    • HUD’s optional Rank and Rating Tool containing maximum scores and final scores; or
       
    • A document outlining the CoC’s rating and ranking process; or
       
    • A screen shot of a public posting of the rating and ranking process.
       
  • 1E-1. Public Posting–30-Day Local Competition Deadline
     
  • 1E-1. Public Posting–15-Day Notification Outside e-snaps–Projects Accepted
     
  • 1E-1. Public Posting–15-Day Notification Outside e-snaps–Projects Rejected or Reduced
HUD is further clarifying for question 1E-4, applicants must combine the following evidence into one attachment and upload it on the 4B. Attachments screen–HUD will use this attachment when evaluating question 1E-2.:
  1. Evidence demonstrating the objective review and ranking process includes two parts:
     
    1. Final score forms used in the local competition that lists points awarded during the ranking process. Applicants should review NOFA rating factors, especially Section VII.B.1.a. to ensure that the attachments demonstrate that the CoC used objective criteria (e.g., cost effectiveness, performance data, type of population served, or type of housing proposed); included at least one factor related to improving system performance (e.g., exits to permanent housing destinations); and included a specific method for evaluating projects submitted by victim service providers that utilized data generated from a comparable database and evaluated domestic violence projects based on the degree they improve safety for the population they serve. Examples of attachments include:
       
      • HUD’s optional Rank and Rating Tool containing maximum scores and final scores; or
         
      • A scoring tool used by the CoC to evaluate projects that includes the specific objective criteria and their respective point values; or
         
      • One completed score form for a renewal project application used by most project applicants–HUD does not expect applicants to attach score forms for each application or component type; and
         
    2. Ranking process documents that demonstrate that the CoC applied the rating and ranking process (as outlined in the 1E-1 attachment) and used forms that generate projects scores (as evidenced in 1E-4). Example attachments include:
       
      • HUD’s optional Rank and Rating Tool containing maximum points and scores; or
         
      • A document that lists all projects that includes the final project scores; or
         
      • The final CoC Priority Listing that includes the New, Renewal, UFA Costs, if applicable, CoC Planning, and YHDP Renewal Project Listings; or
         
      • Screen shot of a public posting of the final CoC Priority Listing; or
         
      • Screen shot of a public posting of the final project scores.
         
  2. Evidence demonstrating public posting of the final version of the completed CoC Consolidated Application, including the CoC Application with attachments, CoC Priority Listing with reallocation forms, and a list of all project applications the CoC accepted and ranked or rejected. (HUD does not expect applicants to include individual project applications with submitted evidence.)
         
Visit the HUD Exchange at https://www.hudexchange.info